top of page

OUR

PROJECTS

HIGHLIGHTED EXPERIENCE

PLUSPETROL S.A.

  • Gas pipeline from wells to field collectors - 4.100 m - Ø 6 "-4"

  • Gas pipeline from well 1029 to UPAIII - 2,100 m - Ø8 "

  • Aqueduct in ERF from well 1009 to PTC in Jaillosa deposit - 4,800 m - Ø4"

  • Steel aqueduct with interior lining and conversion of producing wells to injectors in Centennial Deposit - 8,800 m - Ø 4"

  • General tasks service. Permanent equipment in El Corcovo Field, construction of offices in Warehouses. Construction of pipe laundry.

 

ROCH S.A.

  • Building of trunk gas pipeline at Coirón Amargo Field - 12.00 m from - Ø6 ".

  • Launcher and receiver assembly - measuring bridge

  • Gas pipeline from well x-2 to PTC - 4,500 m - Ø3 "

  • Pipeline at Cerro Negro deposit, Río Gallegos - 12,500 m - Ø 9 5/8"

 

PETROLERA PAMPA S.A.

  • Building of locations, 2012 drilling campaign, Senillosa Field.

  • Engineering, construction and assembly of surface facilities.

  • Installation of training, conditioning, compression, gas pipeline and installation of reception and measurement.

 

YPF SP S.A.

Welding service. Maintenance, repair and improvement of drilling equipment.

 

MEDANITO S.A.

Building of locations, 2012 drilling campaign, Medianera Deposits.

 

MADALENA AUSTRAL S.A.

  • Building construction of location and development of Curanhuele Field.

  • Laying of lines and service of re runners of wells in production.

 

UTE ENARSA-G&P

Building construction of 3 locations in Aguada del Chañar Field.

 

GAS  Y PETROLEO DEL NEUQUEN S.A.

Maintenance of locations and roads in Aguda del Chañar Field.

​

WINTERSHALL

Building of three locations and 12,500 m of road in Aguada Federal Deposit.

 

PETROANDINA

Building of pre-engineered warehouses and anchors for wells. Construction of 90 wells. El Corcovo deposit.

 

PETROLERA DEL COMAHUE

Building of two locations and access roads. Los Olivos White Field.

​

METROGAS S.A.

Pipeline reinforcement at trunk line Ezpeleta Quilmes Urban Zone - 2,000 m - (with smart digger).

 

YPF-EDVSA

Adaptation of fire networks in: PTC Mendoza center-north battery Mendoza-PTC Neuquén - LP.

 

UTE SUPERCEMENTO-ILKA

Gas pipeline and fiber optic network to the towns of Castex-Conhello-Rucanello-Luan Toro-Loventue-Victorica-Telen- La Pampa. Gas pipeline: 126,000 m -Ø 6". Fiber optic: 126,000 m.

 

CAMUZZI S.A

Pipeline reinforcement at trunk line in Río Gallegos crossroad Rio Chico – Santa Cruz       - 1500 m - Ø 6"

 

 

 

Headquarters

Belgrano 265 - 4P - Of.A - Neuquén 8300, Argentina

Phone

​+54.299.593.6128

+54.299.436.0456  

© 2015 Filo Hua Hum

Send us your CV

rrhh@filohh.com.ar

bottom of page